Analysis of Causes for Common Delays in Decoration and Avoidance Measures
Autumn and winter season for decoration, decoration and more people, one by one decoration company after the project, many ready to move into the new home before the Spring Festival, the owners have begun to fingerboard, counting the days to ensure that they can stay in a new home on time. However, the postponement of renovation is indeed a common phenomenon, and the impact caused by the postponement of the decoration makes it difficult for the owner to withstand time, economy, and spirit. Let's take a look at some of the common causes of delays in the decoration . Only by understanding these reasons, we may be able to avoid many detours and eliminate many unnecessary troubles. Decoration delay common causes Reason for delay 1: Irrational process arrangement or staff deployment Renovation is a relatively complex project that requires the integration of multiple resources to achieve the integration of design, construction, and home furnishing. In this process, the things that need to be done are trivial and complex, which requires the decoration companies that have chosen to have excellent management capabilities. Many renovation delay projects originated from many home improvement companies unilaterally pursuing orders, but did not rationally analyze their own scheduling capabilities for construction, installation, etc., resulting in many projects in practice and out of touch with the agreement. Delay reason 2: The renovation program is constantly changing After the commencement of the construction, the continuous modification of the decoration design scheme is also a major reason for the extension of the decoration. Among them, some of the changes are the owners did not confirm before the clear and wait until after construction to feel inappropriate and requested to change; there may be a decoration company to increase the budget, designers or construction teams put forward for various reasons. Delay Reason 3: Main Material Fails to Enter on Time Nowadays, many homeowners choose half-bundle decoration methods. The decoration company is responsible for the construction and basic auxiliary materials, while the main material requires the owner to purchase it. If the main material does not enter the site on time, the construction time may have to be postponed. In addition, the decoration workers may delay the construction period due to the disruption of the schedule. Delay reason 4: Acceptance is not punctual or the project payment is not timely In the renovation, there are some projects such as hydropower projects that require acceptance by the owners before they can carry out the next construction. Many times, because the owner is very busy, he has no way to sign and confirm the site at the time of acceptance. Therefore, the acceptance time must be postponed. In addition, some of the decoration works are paid in installments, if the owner fails to settle the phased construction funds in time, Construction work may stop work and delay renovation. Delay reason 5: Rework due to non-compliance of construction quality During the renovation, the owner found that the construction party was shoddy, and when the acceptance was unqualified, it would require a rectification. Therefore, it will inevitably cause delays in time and affect other processes or types of work. Winter decoration postponed delivery to avoid measures 1, decoration delivery schedule is indispensable Now we all know that the renovation of the formal decoration company to do, so it will certainly sign the renovation contract, in the signing contract with the decoration company should pay attention to the above delivery schedule, this is very important to avoid delays in handing over, the industry's main attention in addition to the requirements of decoration In addition to specifying the progress of the project in detail, the company also needs to agree to overtime liability for breach of contract, increasing the penalty for delay of the decoration company to more than 1% of the total daily amount of money, so that it can protect our own rights and interests at the maximum, and at the same time, handing over to the decoration company. Time is also very limited, and the decoration company will do its best to follow the construction process to ensure that it will not be delayed. 2. Details of the decoration materials The decoration contract signed by the landlord and the decoration company will include a material declaration sheet. It will show in detail the brand, specifications, quality level and quantity of the required materials. Do not underestimate this item. This can be related to your own furniture house. The quality of the decoration, after the renovation of the inspection of the house to check the list to check the acceptance, meet the qualified can be signed to confirm the acceptance, non-conformity must refuse to sign until the consultation with the decoration company to resolve. If there is no such list, some bad decoration companies will shoddy, so even if the house has not been postponed, the quality level is not the same. 3, concealed project acceptance must be careful The home improvement concealment project must be checked and accepted before it is closed. The pipeline project includes electrical circuit, water supply and drainage, gas pipeline, and air conditioning system. The structural project includes the internal structure for fixing and supporting the load of the house, including the water route and the circuit. Waterproofing, etc., should be participated by the owner, project supervisor, and construction manager. Only after the inspection is accepted, can the construction be continued. The inspection must be done carefully. It is best to find the person in charge of the third-party supervision. After all, professionals can find themselves quickly. The problem. The acceptance of concealed projects must be timely so as not to delay the construction process behind them and affect the delivery time. 4, the warranty agreement can not be forgotten After the house decoration is completed and accepted, the decoration company will settle the end of the project. In order to avoid the miscalculation of the added item, the owner shall measure and verify the increase and decrease items appearing in the decoration process. The decoration contract and drawings are carefully checked to check whether the signed construction project has been completed. Whether the design achieves the expected results or not, and after the acceptance is completed, the owner must sign a warranty agreement with the home improvement company. The recent news that the house has been repaired frequently appears in the newspaper. , The warranty agreement can not be signed, this is also a late protection of the quality of the home house decoration. Under contract If the decoration is delayed due to the renovation of the company, the owner should work in accordance with the contract, and strive for their own legitimate rights and interests. The contract clarified the compensation for the decoration delay: In the contract signed during the renovation, the specific amount and details of breach of contract were specified and strictly executed in accordance with the contract. The contract did not specify the deferred compensation for the decoration: when the decoration company signs the contract with the owner, it sometimes deliberately ignores the extension of the decoration. If there is any delay, the decoration company may repudiate this and will not be compensated. However, this situation can also be resolved through consultation, through third-party adjustments or lawsuits. Completion contract: Foreseeable decoration delay. If it is determined that the contractor has been delayed due to the cause of the contractor, and there is no delay in the contract, the owner can make up for the delay, sign a supplementary contract, and add the deferred compensation clause. Editor's summary: Therefore, when choosing a home improvement company, you need to choose a professional and reputable decoration company, and specify the decoration date when signing a decoration contract, and make clear regulations regarding the possible delay of decoration. How to avoid the renovation contract trap decoration to find decoration company okay decoration materials brand home improvement decoration step decoration delay
About high speed Door Accessories:
1.Driving system: High Speed Door Servo System motor and control, motor SNMA / SEJ +reducer+flang+encoder+control box
2.Other accessories: Middle aluminium bar, bottom aluminium bar, aluminium vertical track, stainless steel vertical track, brushes,round nylon strip, PVC roll, rolling steel tube complete, drum be;;s for rolling tube, side end covers, stainless steel cover, steel tubes, air bag sensor system, safety light beam, Microwave sensor 24 Gigahertz,PVC welding machine, smoke and fire sensors, PVC transparent window, magnetic loop, photocell, remote control, manual push button, sound warning alarm Led lamp traffic light
For some main accessories, here is detain introduction:
1).24G radar sensor:
Brand: Hofic
Technology: Microwave processor
Maintain time: 0.5s
Protection: IP54
Transmitting frequency: 24.125GHz
Maximum installation height: <5meter
Transmitting power density: <5mw/cm2
Power consumption: <1W(VA)
Installation angle: 0-90°(lengthways) -30-30°(crosswise)
Supply voltage: AC&DC 12V-30V
2).Photocell:
Approval CE & ISO9001
Power supply AC/DC 12-30V
Static current 25A
Action current 40mA
Mounting distance Max 10m
NO or NC contact Done by NO./NC. contact selection
Working environment temperature -42℃ to +45℃
Working environment humidity 10 to 90%RH
Appearance dimensions( controller) 123*50*32mm(L*W*H)
Appearance dimensions(Magic eye head) 19*13mm(L*D)
3). Remote control
Operating Voltage: AC220V/50HZ+-20%
Transmit power:≤100mW;Super regenerative module, strong anti-interference
Operating temperature:-30℃-+70℃
Working frequency: 433MHZ;transmitter 1527, millions of encoding chip
Accept sensitivity:≤110dB
Manipulation method: electric remote control
Configure the quantity: Wireless number; factory configuration transmitter two. Can be equipped with PT2272 digital decoder chip
Configure the function: Up, down, stop, anti-lock full-featured reproduction
4). Magnetic loop
Voltage: 12V AC/DC +-10% 24V 115V AC+-10% 230V
Power: <2VA
Continued electrical output: 7A / 250V AC
Frequency range: 20 to 200K Hz
Response time: infinity (factory setting) or adjust maintain time
Sensitivity: 0.01% to 0.1% divided into 3 levels
Protection level: IP30
Electromagnetic compatibility (EMC) Complies with EM50081-1 and EN50082-2
Detection loop inductance: the limit of 40uH to 100uH ideal value 80uH to 300uH
Operating temperature: -25 ℃ to 70 ℃
Storage temperature: -40 ℃ to 85 ℃
Relative humidity: <90% non-condensing
Temperature compensation: automatic compensation up to 50 ℃ / h
Connection type: 11 pin DIN rail socket
Dimensions: 41 * 78 * 85 mm (width * height * length)
Weight: 250 grams
5). manual push button
This exit switch button is made of ABS and has built-in indicator light make it looks more elegant and fashionbale. It can be widely used in public entrance gates, public door, home, office, hotel, etc.
Door Exit Button Push To Exit Switch Door Opener For Access Control Security
Main Feature
Fashionable appearance
Made of ABS Plastic
Easy to install and operate
Used for access control
Specification
Mechanical Life: 500,000 test
Material: Plastic
6). Limit switch encoder
Voltage: DC5V-24V
Output voltage: high voltage≥85%Vcc, low voltage≤0.5V
Maximum mechanical speed:6000rpm
Anti-vibration: 50m/s,10-200HZ,XYZeach way 2 times.
Current consumption:≤30mA
Response frequency: 0-100KHZ
Protection: waterproof,oil proof,dust prevention, IP54
The output code system: binary code
Operating life: MTBF≥30000(+25℃,2000rpm)
Rotational inertia:4.0x10-8kgm²
Maximum load:radial direction20N
Axial direction:10N
Weight: about 0.4kg
,Electronic High Speed Door Accessories Shenzhen Hongfa Automatic Door Co., Ltd. , http://www.pvchighspeeddoor.com