Home Furnishing Floor Heating Notice
>>>Related Links: The specific process of laying the floor heating Users should pay attention to the use of warm floor: 1. The maximum water supply temperature of the system is 65°C. It is recommended not to exceed 60°C. The maximum system pressure is 0.8Mpa. It is recommended not to exceed 0.6Mpa. 2. Before connecting the main water supply pipe to the water separator of this system, you should first flush the main pipe (to prevent foreign matter from entering the system) and then connect the system. 3. When starting the system for the first time, please proceed as follows: First pass water at 25-30°C, open the valve between the floor water supply pipe and the return pipe, so that the return water enters the floor water supply pipeline. After running for one week, the temperature of the water supply is increased by 5-10°C per week until the water supply. When the temperature reaches 60-65°C, normal operation is possible. If the water supply temperature exceeds 60°C, the valve between the return water and the water supply should be opened so that the floor can be heated and returned to water for use. To adjust the room temperature, the temperature of the floor heating system and the amount of water entering the system should be adjusted based on the outdoor temperature. High outdoor temperatures can reduce the amount of water in the system and reduce the water supply temperature, and vice versa. 4. During operation, it should be regularly checked whether the filters, valves, thermometers, pressure gauges, etc. can be used normally, and impurities in the filter should be regularly cleaned. If any damage is found, it should be used after repair. 5. If the indoor temperature is lower than 5°C in the winter after construction, the water in the system should be blown out by the air compressor to avoid freezing the system. Non-heating season systems should be filled with water. Decoration note: 1. The warm-up structure should be familiar with the decoration process, and effective protection measures should be taken for the floor heating system. 2. Do not disassemble or modify the system without authorization. 3. Drilling, drilling, nailing, etc. are strictly prohibited in the floor heating area. 4, floor heating to the ground shall not be subjected to more than 2T/M2 load and pressure of 0.2kgf/cm 2 or more. In the areas where heavy objects are placed, scaffolding legs and handcarts are in contact with the ground, hard wood boards shall be supported to increase the contact area with the ground so that the ground load can meet the requirements for use. 5. It is forbidden to adopt the construction method of adding wooden dragon frame empty wooden floor so as not to affect the heat dissipation of the system and damage the pipes in the floor structure. 6. If users need to lay wooden floors, they should use adhesive wood flooring, parquet wood flooring and man-made composite flooring. 7. If leakage occurs in the underground pipeline system, the waterway valves on the water separator may be closed first, and the property management department or the heating construction unit is required to handle it in time. Floor acceptance heating interior decoration heating Bicycle Aluminum Profiles,Standard Aluminium Extrusion Profiles,Extruded Aluminum Profile,Black Anodized Aluminum Profile Guangdong Jihua Aluminium Co., LTD , https://www.gdaaluminiumprofile.com