Home Improvement Tips: Technical Requirements for Paving Floors
First of all, the floor before the floor pavement should have smooth and dry basic conditions. Second, the installation of the floor should follow the following technical principles: First, 15 mm should be left between the door and the ground. Geothermal users should confirm the reliability of the system. It is recommended that the surface temperature should not exceed 27 degrees. Second, the paving staff In order to adjust the floor to extend from the door to the room, the maximum span of the floor is 6 meters by 8 meters. If it exceeds this limit, a contraction joint must be left and the buckle must be used. Third, the wall root, the door bead interface, etc. Reserve expansion joints larger than 8 mm; whether the joint is continuous and uniform, whether the residue is cleaned in time; based on moisture resistance, anti-deformation, and easy cleaning, the pavement floor adheres to the use of floor adhesives, even if it is a lock-up floor. Adhere to this principle; Fourth, the baseboard must reach 12 mm thick, otherwise it is difficult to cover up the contraction joints, but also easily deformed; Fifth, the aluminum film used for moisture-proof floor mats should guarantee quality. High-quality aluminum film is not easily torn by hand, and inferior aluminum film is easily broken by hand; sixth, the thickness of the aluminum alloy bead should be more than 2 mm. Too thin and easy to warp deformation. Finally, the problem of floor maintenance, floor maintenance is best done once a month, can extend the life of the floor, increase the brightness, easy to clean, prevent moisture in the air from infiltrating into the substrate, resulting in floor deformation. Nature floor del floor decoration company decoration aluminum alloy door Furniture Handle,Exterior Door Handle,Nordic Brushed Gold Handle,Space Aluminum Alloy Handle Guangzhou Junpai Hardware Co., Ltd , https://www.gdjhfurniture.com