What are the renovation procedures and steps?
There are many ways to decorate a house, but we have to have certain decoration skills. Before we decorate a house, we need to understand the structure of some houses. In addition to these, we have some methods. We must understand the precautions for house decoration. So what are the renovation procedures and steps ? What are the precautions for the decoration of the house? If you want to know, let's take a look at the small series of the decoration home network. First, what is the renovation process and steps? 1. Before you decorate, you must put a few things in your bag. Tape measure (buy 5m, do not 3m), calculator, large board clip (clip list, receipt); In addition, it is best to prepare old towels at the construction site (soft cotton, paste bricks) , plastic bag (wrap around the pipe joint to prevent dirt from clogging. 2. When the framework appears, we need to fill things inside, but Xiaobian's so-called filling is not anxious to move the appliance, but to carry out hydropower line transformation, tiling, wall painting. This will deal with these first, and then it will be easier to install appliances such as range hoods. After the kitchen tiles are finished, you can go through the wall painting and paint the furniture. 3. Hydropower transformation, no regrets to eat. The bricks are on the wall and on the ceiling. It is hard to add a socket. Therefore, be sure to determine the exact location of switches, lamps, basins, bathtubs, washing machines, etc. Before the hydropower transformation, the cabinet designer should go to the door for the first measurement to help you determine the power and waterway transformation plan. Water heaters, it is also best to send people to design the location of the power supply and interface according to the model you have determined. Second, the precautions for the decoration of the house 1. It is also very important to test the water pressure after the water pipes are drained. When testing, everyone must be present, and the test time is at least 30 minutes, and the condition is allowed, preferably one hour. 10 kg of pressure, and finally no test to pass. 2. Regardless of the size of your house, you must consider whether it is comfortable to stay in the future. I believe that many people will try to build the house even more when conditions permit, resulting in the final neglect of the comfort of the house. If your house is used to live by yourself, comfort should be the first element of the decoration. 3. The running line in the wall should be designed well. This will not only affect the cost of the concealed project, but also reduce the number of inserts in the later home life, which is conducive to the improvement of the cleanliness in the home. The design of the socket is cumbersome, but the owner can plan the preset position of the power product that must be in the home in advance. Housing decoration is to determine the style first, but now the decoration of the house must first understand the process and steps, then what is the decoration process and steps and what are the precautions, I want to introduce the above small series, everyone knows about these If you still want to know more about decoration, then continue to pay attention to the decoration home Internet cafe. More related wonderful reading: What is the renovation process and steps? Renovation house considerations
1. Use Surface Mount System to install electron component. High quality stable and more quality consistency.
2. Pass germany TUV testing, have EMC and LVD certificate.
3. The AC input power voltage is made between 85V to 240V. So it could select AC input voltage automatically. You could work in AC USA 110V or AC europe 220-240V.
4. CEL: Cellulose electrode is special electrode to lay big pipe on oil and chemical industry, natural gas, electric power, civil pipeline of oil, gas, water. They need high ilder voltage (more than 90V). This machine could do
Plasma Cutter,Air Cutting Machine YongKang WALMA Tools CO., LTD. , http://www.walmatools.com