Detailed analysis of the 20 parts of the renovation process
(I) Pre-design In the same way, the difference between humans and bees is that the construction of bees is a reflection of instincts. Before humans are built, ideas and frameworks are first formed in the mind. Therefore, if the home improvement compared to a battle, then the pre-design home improvement is the battle of the "war plan" is the home improvement "soul link." Therefore, what is said in the last article "Tang Liang Manufacturing" in the last chapter is all about the issues that need to be taken care of in the early design, and it will not be repeated here. In the early design, one of the things that the classmates must do is to make a detailed measurement of their own room. Don't be lazy. It's best to measure it yourself. The measurement includes: 1. Identify the area involved in the renovation process. Especially the tiling area, wall paint area, wallpaper area, floor area; I remember that when my foreman at last told me to lay out the total amount of bricks according to the “actual amountâ€, he measured 10 square meters more than the area I measured. I was really dumbfounded. After re-measurement, the foreman returned to reprimanding the bricklayer and said: "How do you measure?!" This is why I suggest that you measure yourself. Many places are decorated with the same principles as human beings - we don't necessarily understand it, but we must have a few. (II) Demolition of the main body Into the construction phase, the main demolition reform is the first project on the first, mainly including the demolition of walls, walls, spade shovel, demolition heating, change steel windows and so on. When the main body is dismantled and reformed, it is to put the framework of the construction site first. (III) Hydropower Reform Before the transformation of the water circuit, the demolition of the main structure should be basically completed. Between the two stages of hydropower reform and main body demolition and reform, some students may know that the first measurement of cabinets should also be conducted. In fact, the so-called cabinet first measurement has no actual content, because the wall and the ground are not processed, the cabinet designer can not give a specific design size, but only for the developer reserved water inlet, hood socket Location, make some suggestions. mainly include: 1. Check if the position of the socket outlet affects the installation of the hood in the future; 2, see if the location of the water meter is appropriate; 3, to see if the position of the inlet is convenient for installing the sink later. For the first measurement of the cabinet, slightly experienced students can do it completely. After the waterway is completed, it is best to do the waterproofing of the bathroom. The kitchen does not generally need to be waterproof. Some students have always thought that before the renovation began, some main materials should be advanced. What I want to say is that, unless it is the main material needed for the demolition of the main body, the entry time of main materials such as tiles and large core boards should be after the hydropower reform. Because the circuit modification involves ground slotting, if tiles or large core boards are improperly positioned, it is troublesome for workers to move in and out. Two days ago, the "rat" classmate also told me that her family had encountered the problem of the workers returning from the room full of bricks, reminding the students to pay attention. (d) Woodworking Carpenters, bricklayers, and oil workers are the “three brothers†in the construction process. The basic order of appearance is: wood-tile-oil. The basic appearance principle is - who is dirty and who is the first. "Who is dirty? Whoever is above" is also one of the basic principles that determine the order of home improvement. I will mention it later. In fact, carpentry activities such as installing standpipes, making decorative ceilings, and attaching plaster lines can be considered in a sense as a detailed link of the main demolition and reform. They themselves do not conflict with the transformation of water circuits, and sometimes they still need some. Cooperation, as mentioned in my last post, “If you are planning to make a false wall at home, consider whether there is a hydropower circuit on the false wall. If there are, you should let the hydropower reform workers pre-manage.†<<< link: rookie decoration secret code: the most complete decoration process detailed! (five) tiling If the workers are too busy, the foreman will normally allow the bricklayer to enter the tiling when the “wooden boss†is not over. This is normal, because there is no conflict between the two. In the process of “bricklayerâ€, the following three steps are also involved: 1. The installation of door stone and marble windowsill. The installation of the door stone can be done together with the paving tiles, or after the paving tiles, the installation of the marble window sill is usually done after the window cover is done. The marble worker will prepare the glass glue, and the marble and the window cover are sealed with glass glue. Now. 2, the installation of floor drain. The floor drain is the first one to appear in the home improvement hardware because it needs to be installed together with the floor tile. Therefore, when the students started to visit the building materials, they should buy land drains as early as possible. 3, hood installation. The hood is the first appearance of the appliance. After the kitchen tiles are laid, you can consider installing the hood. “The bricklayer's second cousin†leaves the floor. At this time, the cabinet can be measured for the second time. Accurately speaking, after the wall tiles have been attached and the hood is installed, the second measurement of the cabinet can be performed. (six) brush wall paint The “oil worker's third child†entered the field and mainly completed the work of basic wall surface treatment, brush finish, and painting of furniture hit by the “wooden bossâ€. To prepare wallpapers for students, you only need to let the “oil worker†in the plan to do wallpaper on the wall. As for whether or not to stay in the paint for the last time, I personally feel that this problem is not necessarily too true. From the experience of my renovation, the significance of leaving the paint once again is not great, because the back of the paint is no more dirty than the paint. Now. Written here, dead against breath, chat with everyone. When the “bossâ€, “second child†and “third child†have left the field one after another, many students will think that their decoration is almost over. In fact, if the number of links is counted, one-third is not enough. The reason why everyone has this feeling is that people generally understand the decoration is only the decoration of the "construction part", in fact, the decoration of the "installation link" is also the focus of decoration. If the "design link" is to "conceive" the look of our future home, then the "construction link" is to "package" our home, and really say that "home-made" homes are almost all in the "installation phase." Drink saliva and continue... (7) kitchen ceiling Cupboard ceiling as the installation of the first team, or in the continuation of the home "packaging." At the same time as the kitchen ceiling, the kitchen's moisture-proof ceiling lamp and exhaust fan (Yuba) should have been bought. It is best for students to install ceiling lights and exhaust fans (bath heaters) at the same time, or to leave heads and openings. By the way, I am firmly advocating "outsourcing", even if the foreman and I promised him how the worker's hydropower reforms were done, how the rules were regulated, how the aluminum buckles were installed, how the wooden doors were made strong, and wallpapers were posted. How to be professional and how to build cabinets is practical. In my opinion, what the decoration team can do is carpentry, tiling and painting. Because I believe that professional construction, I believe that the manufacturers of the installation level, believe that the product line of production, most of the manual than the decoration team workers slightly better. The decoration is like a game. The gambling is the workmanship of the workers. Therefore, betting on “My workers are construction geniuses†is not practical in my heart. The reason why many students let decoration companies and decoration teams undertake a large number of construction tasks is because, on the one hand, their own time is not plentiful, and one reason is because they consider the problem of “construction of projectsâ€. I originally decided to outsource hydropower reform, and my neighbors reminded me that it is troublesome to link up later. In fact, every aspect of the decoration is very independent. I remember that there were questions from the students in the forums of the former part of the South. He said that his home was renovated, and every link was made by the owners asking for special workers. Home decoration is such a thing, it really does not have any convergence at all, on the contrary, the classmates themselves should try to play the so-called "cohesion" in the home improvement process, accurately grasp the choice of materials, master some simple construction process, handle well This is the key to the relationship between workers, etc. Really want to say that because of the problem of “convergenceâ€, such as the question of who will be responsible for the installation of the sanitary ware, lamps, and hardware in the later period, it depends on you and the workers to see whether there is anyone willing to “control†you. On the other hand, when it comes to the number of people who did not "control", I still say that "Since God invented the money, there was no problem that could not be solved." Decoration, quality is always ranked first, is the main contradiction, is the principle. Some links are secondary because of the problem of "convergence." Students must be cautious while preparing for major contradictions and major concessions because of minor contradictions.    (8) Kitchen cabinet installation After the ceiling is over, the cabinet door can be installed. If it goes well, one day can be completed. At the same time there is a sink (can not include water and water parts) and gas stove, the best coordination of the property before the installation of the gas pass, because the gas stove installed after the need to test gas. Yes, just mentioned ceiling, there is a problem worthy of everyone to discuss, many students kitchen and toilet ceiling selection of waterproof gypsum board with waterproof paint, decoration team offer is generally more than 120 yuan per square meter, than the average aluminum buckle, PVC buckle ceiling Must be expensive. The gypsum board ceiling looks relatively flat from the visual, but once there is a problem with the top surface water pipe, or if the leakage above the floor requires downstairs maintenance, etc., the gypsum board ceiling needs to be removed as a whole, which is much more costly than the buckle board ceiling. Therefore, we need to be cautious when choosing plasterboard ceilings. (9) Door installation On the second day of cabinet installation, as soon as the wooden door measurement was completed more than one month ago, it is now possible to install it. If it goes well, it is also the time of the day. The hinges, door locks, and suctions to be installed at the same time when the door is installed. Students should prepare relevant hardware in advance. If you want the wooden door manufacturers to install window covers and gargles, they should be measured together when the wooden door manufacturers measure them, and they should be installed on the same day that the wooden door is installed. At the same time, the installation time of the marble window sill should be considered wrong. After installation. Remarks: The production period of wooden doors is generally one month. Therefore, in order to make the construction period close together, it is necessary to allow door manufacturers to measure the size of door openings as soon as possible after the completion of main body demolition. With regard to the handling of door openings, we need to pay attention to the fact that if the height of the door openings is inconsistent, workers need to be treated as if they are of equal height - good-looking. (10) floor installation The floor can be installed on the second day of the wooden door installation. If it goes well, it is also a day. Floor installation needs to pay attention to the following issues: 1, before the floor installation, it is best to allow manufacturers to come and survey whether the ground needs leveling or local leveling, some decoration companies or renovation teams will recommend students leveling or local leveling, to the actual survey of the floor manufacturers prevail; 2. Before the floor is installed, the floor of the home's paving floor should be cleaned and the ground must be kept dry. Therefore, do not use water during the cleaning process. 3, floor installation, if conditions, the floor must be cut in the corridor. In the past, the forum also discussed this issue. Some students think that it is immoral to cut floors in the corridors to pollute public areas. My idea is to clean it after it's finished. It doesn't matter. In the indoor cutting of the floor of the wall of the pollution is more serious, similar to the cutting of artificial stone countertops cabinets, I believe that the number of students who have been renovated have experience. (11) Paving Wallpaper On the second day after the floor is installed, the home is cleaned up and the wallpaper can be pasted. If it goes well, it will be the same day. If conditions permit, on the day of paving the wallpaper, the floor should be protected; if it is not conditional, it is okay to clean the leftover wallpaper glue on the floor to the original cleaning. Before paving the wallpaper, try to "don't have anything" on the wall. (12) Radiator Installation On the second day after the wallpaper was laid out, students who replaced the radiators or dismantled the radiators could literally mount the radiator on the wall. The same is the time of day. Wooden door - floor - wallpaper - radiator, this is a generally recognized correct installation order, first install the wooden door is to ensure that the baseboard of the floor can be tightly connected with the door of the wooden door; after loading the wallpaper is mainly because of the floor The installation is more dirty, more dust, and serious wallpaper pollution. Here again I used the principle of "who is dirty? The final radiator is installed because only the wallpaper on the wall can be installed to install the radiator. The gradual progress of the renovation process is designed under conditions of various constraints and constraints. Occasionally there are exceptions, such as Holtzmen need to install the floor after the door, but such exceptions are rare in the renovation process. In addition, I have repeatedly said "One day's time". There is a layer of meaning to remind the students that "one day" is not a long time for the entire renovation. Therefore, even if there is no installation conflict, such as cabinets and wooden doors, the students try not to Book two installations at the same time during the day, especially for the "big things" mentioned above, because the installation is very critical for these "big things". It is better to focus on one site instead of one. ". Learn to comfort yourself - that day is not bad. (13) Switch socket installation There is only one reminder of death: students should have a detailed understanding or record of the number of switches and outlets in the home, and the location, especially for wallpapering classmates. Sometimes wallpaper wallpaperers are not responsible. Wallpapers are hula. The child goes up and he doesn't use a wallpaper knife to mark the hole in your switch socket. Therefore, the students still need their own minds. (14) Lighting installation Loading lights, nothing to say. After the lights were installed, the home was bright and bid farewell to the dazzling glare of the 100-watt incandescent bulbs during the renovation - it felt good. (15) Hardware ware installation Before buying good plumbing, bathroom accessories, toilets, drying racks, etc., they are all installed. After those “big things†were installed, the family was still “coldâ€. After the fixtures and hardware were installed, the family “lived†and really “livedâ€. It is not an exaggeration to say that the first time you opened the dragon water and watched the flow of water “squeaking and squeaking,†your heart would be beautiful; for the first time at home, a newly installed toilet would be very fulfilling, right. I also gave it a good name - "Virgo." The installation of curtain rods marks the end of home improvement. (17) Pioneering cleaning Before the pioneering cleaning, do not install curtains. I reminded you in the post on “Interpreting the Curtainsâ€. When pioneering cleaning, homes should not have furniture and unnecessary appliances. Try to keep more "flatness" so that the pioneering cleaning can be thoroughly cleaned. (18) Entry of furniture With regard to the purchase time of furniture, my suggestion is that after the completion of the transformation of the water circuit at the earliest, the basic size range of the furniture we choose is only a few. Therefore, some students have already rushed to set the furniture before the decoration has begun. Personal feeling is not necessary. (19) Entering home appliances At this time, the entrance of the appliance to enter the field, the installation of the installation, ready to stay! (20) Home Accessories Home accessories, the final step of home improvement, and has been transformed from decoration to decoration, including the installation of curtains are part of home accessories. As for the purchase of curtains, it is best to order furniture to avoid style conflicts. Home accessories also include considerations such as buying some green plants, wall paintings, handicrafts, etc.... In short, after your stay, you are free to play. Decoration Process Wallpaper Window Door Paint Decoration Design Decoration Decoration Company Decoration Style Home Wallpaper Glass Brick Cabinet Door Marble Tile Kitchen Ceiling Household Cabinet Technology Glass Glass Furniture Marble Cabinet Kitchen Cabinet Door Floor Tile Home Crafts Glass Door Kitchen Glass Sliding Door Bathroom Tile Toilet Door Bathroom Ceiling Material Bathroom Door Size Bathroom Size Toilet Design Toilet Ceiling Overall Toilet Public Toilet Toilet Waterproof Bathroom Floor Tile Toilet Leakage Home Furnishing Home Decoration Home Tile Plastic Kitchen Tile Floor Tile Decoration Home Geotextile Geotube,Dewatering Geotube,Pp Geotube,High Tensile Geotextile Geotube Shandong Jinruixiang Geotextile Material Co., Ltd , https://www.jrxgeosynthetics.com
2, clear the main wall size. In particular, it is necessary to design the wall size of the furniture later.
(16) Curtain rod installation