Excellent Air Permeability Performances and Waterproof Texture Coatings Paint
B&H TOOLS CO., LTD. , https://www.bandhtools.com
Product instruction
1.Fully stir well before construction
2.According to the product label
Base mater ial handling:
1. surface must be clean and dry before constructionÂ
2.Removal of the construction surface of the oil, grease,wax and other
append ages. Construction matters needing attention:
1.different types of products are used in different types of product specification
2 according to the per formance of different products can choose to spraay, brush,
spray or dip coating for construction.
3.in strict accordance with the guidance of the construction ratio, the construction
scotty can be s light ly adjusted according to the situation.
4. with paint after stirr ing evenly, filtering.he 5 is \ow (less than 5 DEG C) and high humidi
re than 85%) under construction. The construction of more than 25 DEG C temperature,humidity is less than or equal to 70%
is the best.
Special counsel:
1.construction environment sanitation.Â
2.other sensitive parts should be not edible
3.accidentally splashed into the eyes immediately, if necessary. to the hospital
4 chemicals can not be casuaIly discarded.
5 after the opening of the tank did not run
6. after dilution of the product as soon as out of the product sea possible
did not run out of the prooduct is prohibited back to the tank
static 5-10 minutes. you can use the construction.
Keep in storage:
1.cool and dry environment.
2.the sun is strictly prohibited.
Â
Packing information Industrial Lubricant oil
Size
Carton Size
Packing
20GP/QTY
40GP/QTY
40HQ/QTY
16L
32*32*37CM
4PCS/Pallet
408PCS
864PCS
1080PCS
18L
34*34*37CM
4PCS/Pallet
384PCS
816PCS
1020PCS
200L
60*60*91.5CM
4PCS/Pallet
80pcs
114pcs
114pcs
Â