How to Accept Acceptance Projects for New Houses

For many busy people, there is not much time to seriously check the house, always think that the relevant departments have already been accepted, and it becomes an alternative, in fact, as long as they have seen the only knowing that the problem is also The rectification can be requested in time to avoid unnecessary trouble in the later period. So how do owners check out new homes ? What are the items to be checked and accepted when the rough house is handed over? Decoration whites may wish to learn.

How to Accept New Home (Main Project)

1, look at the wall

The wall is a very important part of the residence, and its amount is also quite a lot. When it comes to keys, it must be heart-to-heart. It is advisable to check and accept on the second day of heavy rain. If there is a crack, water seepage will occur. It should also pay attention to observing whether the wall surface is smooth, clean, uniform in color, free from hollowing, cracking, and explosion.

2, inspection and hydropower

We are talking about an undecorated house, so there are no complicated water conservancy facilities inside. However, the real estate company also installed some key hydropower lines in advance. We have to check whether electricity can pass, and whether the wires meet the quality of the national standard. The cross-sectional area of ​​the wire meets the requirements. Regarding the waterway, it is mainly reflected in the kitchen and bathroom. See if the pipeline is set up in a fair manner. See if the water is flowing smoothly. Also check whether the sewage pipe has detaining and deodorizing elbows, and then decide according to the needs of your own decoration. Whether it can be changed, but the details of the reform program must listen to the views of experts.

3, inspection waterproof

This is generally referred to as kitchen and toilets, where the moisture content of these two places is large, so it is necessary to do waterproofing. Some houses will indicate whether they will do waterproofing before they are handed in. If it is done, it will be tested. The main water-retaining test is to fill the space with water. The water storage height is generally 30-100mm, and the water storage time is 24 hours. The water surface is not significantly reduced to be qualified. If water leakage is found, the water storage test should be stopped immediately, and the waterproofing must be performed again. The layer is perfected and the water storage test is conducted after the treatment is qualified.

4, acceptance level

This refers to the ground surface. It is the most important part of the residence. It mainly depends on the level difference, which can reflect the quality of the developer's building. However, it is difficult to find problems with the naked eye. You can go to the hardware store and buy a 20-meter small one. Transparent water pipe, after filling with water, draw a sign 0.5 meters or 1 meter away from the ground at the entrance, then adjust the water level of the water pipe to the height of the sign, and find a person to fix it in this position, then move the other end of the pipe away from In the room farthest from the doorway, look at the height of the water pipe to make another sign. Then use a ruler to measure the height of the sign off the ground. The difference between the two levels is the difference in the level of the house. In general, the difference is normal within 2cm. If it is more than 3cm, you must pay attention. In addition, we must also observe whether the ground is smooth, free from hollowing, cracking, loosing, and sanding.

5, examination of high

The height is clearly marked in the contract, and this owner can measure it by himself. The measurement method is relatively simple, but a long rule is used. Usually, it is acceptable at around 2.65 meters. If it is less than 2.6 meters, then it is more depressing to live in, so you may consider it more. Reducing floors is a cost-saving method for developers. It can not only build more floors, but also save a lot of materials.

6, inspection doors and windows

Such a house generally has a door and a simple window. Although it may be replaced in the later stages, it is still necessary to carry out inspections first, mainly looking at the tightness of windows and doors. Whether the window installation is stable, Zhou Zheng, the surface is smooth, whether the switch is flexible, whether the material meets the contract, and whether the guardrail height meets the specifications, safety, stability, and no obstacles. Whether the door is stable, grouting, firm, rubber seal, paint surface intact without falling, missing brush and bump, flexible operation, visual intercom, whether clear and so on.

Summary: The above is how Xiaobian brings you all the information related to acceptance of new houses today. I believe that my friends also have a certain understanding. We can refer to the precautions on how to check and accept new houses . I hope this article will help you. .

Various products of Brass Fitting For The Faucet, providing product images and basic parameters with each Brass Faucet Fitting and Brass Faucet Fitting; We are a professional Chinese manufacturer of Brass Fitting For The Faucet, and look forward to your cooperation!

Our company places the customer first to build value and trust through superior knowledge of the global markets we serve. We attach great importance to pre- and after-sale service. Our products and services will continue to provide innovative water solutions delivered by exceptional people. 


Valve Housing

Valve Cover,Brass Valve Cover,Faucet Valve Cover,Brass Faucet Valve Cover

JIANGMEN YILIN PRECISION MANUFACTURING CO.,LTD , https://www.ylseiko.com