The method of using sand and dust treatment on the ground of factory building

The method of using the sand-dusting treatment on the ground of the plant can use the concrete sealing curing agent to treat the ground. The hardening agent is a permanent cement sealant that is water-based, convenient to use, non-toxic, non-flammable, and strong infiltration. The product is for the existing floor. Due to poor construction, not wear-resistance, and sand development and development. Directly sprayed on the floor surface to improve the sand and wear resistance. Easy to use, without affecting the use of the original floor. Improve the physical strength of various types of surface substrates. Improve chemical resistance and weather resistance. Increase watertightness and increase the surface strength of mortar.


Explanation:

1. A colorless, odorless, non-toxic liquid that can deeply penetrate the floor and create a special hardening effect on the surface.

2. Chemical reactions occur inside the floor surface.

3. Under the action of silicon and fluoride, the free state lime ions in the floor will form a granite-like hard crystalline material, so as to obtain a dust-free, dense whole, and effectively improve the strength and density of the floor surface. Wear resistance

use:
1. Warehouse, sports center, food manufacturing workshop.

2. Factory, computer room, hospital

3. Large-scale supermarkets, parking lots, schools, suitable for medium-load industrial floors, such as: garages, machinery, workshops, factories, pharmaceutical plants, wear-resistant flooring, concrete ground hospitals, GMP pharmaceutical plants, food factories, electronics factories, Laboratory etc.

Construction method
(1) When the newly constructed floor reaches the surface with the final setting and can walk without producing footprints.
After the old floor has been cleaned (the ground must be dry), use a kettle to spray the treatment agent so that the floor is completely wet. If the floor is greasy, wash with detergent. After 24 hours of drying, spray the treatment. The ground is broken and repaired before it can be constructed.

(B) determine the amount of permeability is the key factor in determining the amount!
1. When spraying for the first time, the surface will be dry if it penetrates quickly. Then, it needs to be sprayed a second time. It is usually sprayed a second time after spraying for the first half an hour. If the infiltration is still fast, it needs to be sprayed a third time.
2. When spraying for the first time, if the penetration is not fast, the surface is wet and even effusion may occur. Then just spray it again.
3, according to the actual situation of different parts to adjust the dosage. Faster penetration, more use, slower penetration, less use.