Easy to install wooden doors one step
Doors to buy Nature Flooring Del flooring Wood Doors Space Furniture Renovation Parlor Doors Bedroom LED Simulation Fish Lights,Outdoor Ocean Fish Lights,Ocean Fish Lights of Gardens,Outdoor Fish Lights Sichuan Kangruntengpu Photoelectric Technology Co., Ltd. , https://www.kangruntoplighting.com
Mason resistance door rabbits wooden door 1, talk about the impact of hydropower renovation project, hydropower reform needs to go dark pipe, so the position of the dark pipe alignment should be clearly marked, to prevent the installation of wooden doors in the process of punching line pipe or Water pipes to avoid adding trouble.
2. The order of door and floor installation. It is recommended to install the door before installing the floor. After the ground is processed, the construction of other projects can be completed. When the construction period is nearing the end, it is time to install the floor and the wooden door. Who should install the wooden door and the floor is reasonable? Let's analyze it. If you first install the floor, there are some problems that cannot be solved. First, the position of the transition between the living room and the bedroom cannot be determined. The process requires that the buckle must be directly under the wooden door, and the buckle must not be visible inside or outside the door. Second, after the floor is installed, the skirting board will be used. If the door sleeve is not installed, the skirting boards on both sides cannot be fixed. This way, the workers who install the floor have to come to a fixed position. This wastes both parties' time. First install the door, the door cover can be directly to the ground, when the floor is installed, you can use the electric saw to saw the room under the door cover and lay out a reasonable space. The gap below the wooden door can be set according to the thickness of the floor, generally 2cm-2.5cm.
3. Wooden door measurement. The importance of installing an advance booking. The customer's advance booking can allow the wooden door manufacturers to arrange the workers for construction (measurement time is generally 3-5 days, installation time is 5-7 days ahead). If time permits, don't ask for emergency installation. Some manufacturers will find guerrillas to meet your home's installation.
4. After the arrival of the goods, carefully check the model of the goods, the quantity 5. Before the construction, tell the installation workers the direction of the water circuit. The place where special treatment is required is also stated in advance. Otherwise, the worker will follow the routine operation procedure, so that the desired effect will not be achieved. After the construction is completed, the sanitation is finished, all corners are carefully inspected, and the dissatisfied places are promptly communicated with the installation workers.
Links: Three steps to create a charming living room for furniture