Laminated flooring and solid wood composite flooring laying method


Mi brand wood flooring      Huili floor

â—†Intensified floor pavement method

First, pay attention to the pavement

1. Make sure the floor is dry, flat and clean before paving. Test method for ground drying: Cover a small piece of film (approximately 1000mm*1000mm) on the floor to be paved and seal it with tape for 12 hours. If there is condensation on the inner wall of the film, the floor is in a wet state, otherwise it is dry.

2. The ground to be paved must be leveled, and the difference between the height of the surface per square meter is ≤ 3mm.

3, before the Kaifeng paving, the floor must be flat on the floor at room temperature for 48 hours in order to achieve the same temperature and humidity as the indoor environment.

4, paved laminate flooring, the proposed plastic-free pavement, if you need to use plastic pavement, you must use laminated flooring dedicated pavement rubber, in order to achieve the best results and efficient quality assurance.

5. Thoroughly clean the floor before laying to make the floor tidy.

6, strengthen the wooden floor, not paved in the kitchen, bathroom, outdoor terrace and outdoor.

Second, the basic principles of paving

1. Professional tools must be used. The floor must not be nailed or affixed to the ground.

2. There must be a 10-12mm expansion joint between the fixed objects such as the floor and the wall, columns, etc., and the corresponding expansion joints should be left under the paving between the two rooms. Any paving surface exceeding 8 meters in length shall be provided with an additional expansion joint of 8-12 mm between the floor and the floor exceeding the length.

3, when installing each floor of the floor should be staggered more than 30mm between the three, six, nine paving forms are more beautiful.

4. Reinforced wood floor is recommended to be free of rubber pavement. When connecting with kitchen, bathroom and floor tiles, buckles should be added.

5, laminate flooring should not be paved area: the ground is not smooth, wet or easily damp areas.

6. The direction of the floor paving should be parallel to the direction of the outside light, or parallel to the long side of the room.

7. Do not move on the floor within 24 hours after being covered with rubber.

8, can be laid on the plumbing ground, but can not be laid on the electric heating ground.

9. The paving on the new concrete floor must be dry tested. The test method should refer to the first article of the pre-paving notice.

Third, paving instructions

1. Firstly lay a layer of high-density polyethylene mat with a thickness of about 2mm on the ground. The joints shall be sealed with tape. The ground shall first be covered with a layer of polyethylene film with a thickness of 0.5mm or more, and the overlap shall be more than 50mm. , And sealed with tape.

2, from the corner of the room began to paving, the floor to the side of the head side of the wall, leaving 8-12mm gap between the floor and the wall.

3. For the last paved floor of each row, use a saw to remove the excess of the last floor (more than 300mm should be used for the paving at the beginning of the next row).

4, if you need to take plastic pavement, please use the special flooring adhesive to smear the upper part of the floor, the amount of smear just 1/4 the amount of ordinary floor glue can be the first short-term connection, and then slightly higher, careful Lightly tap the gutter wood pallet and place the floor into the front floor gutter so that the seams are tight and the remaining glue should be removed with a spatula after 15 minutes.

5. When paving the last row, prepare to measure the width of the floor of the last row of floors, and pay attention to leave an 8-12mm expansion joint between the floor and the wall, remove the excess floor, and pave with a pull hook.

6. After installing the baseboard on the reserved part, clean the floor.

â—† Solid wood composite floor suspension laying method

1, the basic level requires a smooth, dry, clean.

2. The laying of the ground floor or cottage should be waterproof.

3, cushion laying materials can be used with a thickness of 3mm with a plastic foam pad or a thickness of 10-12mm bedding treasure, butt laying, plastic interface; also can use the thickness of 9-18mm high-quality multi-layer plywood. Each piece of multi-layer glue should be divided into small pieces, the area should be less than 0.7m2, preferably with paint anti-corrosion, fixed on the ground, must be firmly fixed around the board, between the board and the board to leave 3-6mm gap, sealed with tape.

4. The direction of the paving floor is usually the same as the walking direction of the room. From the left to the right or from the right to the left, the grooves are laid one by one to the wall, and a wooden wedge is placed between the floor and the wall to leave expansion joints. In dry areas, the floors are wet and the expansion joints should be small; expansion joints in wet areas should be large enough.

5. The last row of floors is to be cut, assembled and measured by measuring its width and tightened with pull hooks or screw tops.

6. Take over the bridge installation: In the interface between the room, hall, and hall, the floor must be isolated, leave enough stretch joints, and close the intersection with the hardware bridge.

7, the skirting board installation: the thickness of the optional skirting board should be greater than 1.2cm. When installing the floor expansion joint gap within 5-12mm, use polystyrene board or elastomer filling, to prevent the floor from loosening. Install the skirting board and be sure to cover the extension seam.

Flooring Flooring Floorboards Floorings Floorings Cement Floorings Floor tiles Bathrooms Bathrooms Floorings Bathrooms Doors

Tensioner Bearing

Name

Tensioner Automotive Belt Tensioner Kit auto bearing VKM14224

Brand

XRT

Quality standard

ISO9001:2000 standard

Sample

Avaliable

Delivery date

Normally ready goods and stock

Shipping

DHL, TNT, Fedex, UPS, Ems or by sea

Payment terms

A: 100% L/C at sight

B: 100% T/T

C: Western Union

D: Paypal

Application

Automotive, rolling mill, mining, metallurgical, skateboard etc.

Package

a. According to customer's requirements.

b. Original bearing and good quality packaging.

c. Laser mark on the bearing.

d. Bearing wrapped by vacuum packaging.

e. The outer is color polybag + box + carton,

industrial standard packaging.

Tensioner BearingTensioner BearingTensioner BearingTensioner BearingTensioner Bearing

Tensioner Kit Auto Bearing,Car Bearing Tension Bearing,Car Tensioner Bearing,Auto Car Belt Tensioner Bearing

Shijiazhuang Longshu Mechanical & Electrical Equipment Trading Co., Ltd. , https://www.longsbearings.com