Novice decoration acceptance of new homes 8 strategies
After getting the house, many people feel more than happy and forget about acceptance. It is a very necessary thing for the industrial owner to accept it personally. For his own house, he must be in full swing and have any problems finding the developer in time to seek a solution. New house acceptance notice: 1, look at the wall Do not know when to start, look at the wall has become the main problem of housing acceptance, because the new house wall seepage occurs from time to time, the most serious, all the walls of the entire building below the walls are seepage. But to accept this one, it is best to visit the house on the second day of the heavy rain before going over the building. If there is a problem with the wall at this time, it is almost insignificant. In addition to the seepage of water in the walls, there is a problem that the wall is cracked. A friend once reflected that his family had a crack in a door shape. Later, he asked the developer to know that it was originally an elevator freight port left behind during construction. Later, when it was sealed up, it was handled in a sloppy manner to stay in trouble. 2, inspection and hydropower The first is to check if the house's hydropower is on. Of course, for some high-end renovations, most of the hydropower will be replaced in the later period, so sometimes these are not critical, but if you do not plan to replace water and electricity, then these things must be carefully accepted. Check the wire, in addition to see if there is electricity, the main thing is to see if the wire meets the quality of the national standard. Then the cross-sectional area of ​​the wire meets the requirements. In general, the wires in the home should not be less than 2.5 square meters, and the air-conditioning line should reach 4 squares. Otherwise, when the air conditioner is used, it is easy to overheat and soften. 3, inspection waterproof The waterproof mentioned here refers to the waterproof of the kitchen and toilet. Of course, some of the houses that are currently delivered have already declared that they have not done waterproofing. This requires renovation. If waterproofing is already done at the time of delivery, we have to verify whether the waterproofing is done well. If you do not try it before the renovation, then if you find something leaking when you are renovating, the future maintenance project will be big. You have to remove the floor that has been renovated to make a new waterproof layer. The method of acceptance of waterproofing is: using cement mortar as a door to block the toilet, and then cover it with a plastic bag, then put it in a solid state, and then put the water in the toilet, shallow (about 2cm high) ). Afterwards, the owners who are downstairs are expected to check the ceiling of their home toilet after 24 hours. 4, inspection pipeline The pipe referred to here refers to a drainage/pollution pipe. Utah is a sewage outlet such as a balcony. When it is accepted, take a water-filled appliance in advance and pour water into the outlet. See if the water is flowing smoothly. Why do you want to accept this? Because during construction, some workers often “stolen†this work when cleaning. Put some cement residue into the drain and run away. If the cement is more viscous, it will clog at the elbow and cause drainage difficulties. 5, test ground level The experiment received this, for the general user is a certain degree of difficulty. Ground leveling is the measurement of the horizontal error between the floor and the ground in the doorway that is furthest away from the entrance. Examine this, many times can also reflect the developer's construction quality. Because as the owner, it is impossible to accept the main structure, then the quality can only be seen from these details. Measurement method: go to the hardware store to buy a small transparent water pipe, about 20 meters in length, and then filled with water. First draw a sign 0.5 meters or 1 meter off the ground at the door, adjust the water level of the water pipe to the height of the sign, and find a person to fix it in this position; then move the other end of the water pipe farthest away from the door. Indoors, look at the height of the water pipe at the place, and then make a mark. Use a ruler to measure how high the mark is on the ground. The difference in these two levels is the difference in the level of the house. You can also use this method to analogically measure the level difference in the entire house. In general, if the difference is about 2 cm is normal, 3 cm is in an acceptable category. If you go out of this range, you have to pay attention. 6, test height The method is very simple. Measure the inside corner of the two walls of the wall. You should measure multiple places in the house. In general, about 2.65 meters is the acceptable range. If the house is lower than 2. 6 meters, the house must be considered. This kind of house will make you have to live in a depressing environment in the future. Doing short heights is a very effective cost-saving method for developers. 1) Reduce the total weight, so that the cost of the basic part can be saved. 2) Although it was only reduced by about 10 centimeters, overall, the cost savings are also many, and Utah is still developing a residential area for development. 3) At a certain height, lowering the floor height can create more layers. 7, inspection doors and windows Here it refers to the acceptance window. The key point of acceptance is the sealing of the acceptance window and the balcony door. The most troublesome aspect of the window's sealability acceptance is that it can only be tried and tested in heavy rain. However, it can generally be confirmed by checking whether the sealant tape is intact and firm. The balcony door generally depends on the level difference between the interior and exterior of the balcony door. I have seen a situation where the level of the balcony is the same as the level of the interior, so that it is difficult to avoid the problem of rain infiltration in heavy rain. 8. Other items In fact, in addition to the above items, other acceptances require more professional knowledge. You may wish to bring a friend who is familiar with the project to check the house. This is the only possible thing. In addition, you can only rely on the quality of the quality inspection part. Links: How to Accept Hydropower after the House is Renovated Construction acceptance house window house renovation house interior decoration 2835 Led Chip,2835 Lamp Led Chip,2835 Smd Led Chip,2835 Led Light Module Shenzhen Huangtai Photoelectric Co.,Ltd. , https://www.szhtleds.com