Yu Ming Photochemical Reaction Instrument Product Maintenance and Training Instructions
YM-GHX-V photochemical reactor 1, check the reaction to push all the inlet Kawaguchi valve for Af Chuanchuan, if there is a problem, it must be handled in time.
2. Check whether the flange of the reaction kettle and the base of the reactor are loose, and the safety is protected by pJ.
3. Check whether safety devices such as safety valves, explosion-proof membranes, pressure gauges, temperature juices, etc. are difficult to use, whether the safety valves and pressure gauges have been verified. The seals are intact, and the red line of the pressure gauges is fixed. Whether the membrane leaks c
4. The body of the gold reaction reactor has no cracks, dust shape, bulge, ZL, corrosion, leakage, etc., heat preservation, paint, etc. are not complete, with or without falling off and burns.
5. Check if there is any oil leakage in the reducer, whether the shaft seal is good or not, whether the oil pump is [: oil, check the oil level and the change of the tannin in the reducer. The kettle is sealed in the oil. Add or update the corresponding oil.
6. Whether the speed of the reducer and the motor is normal, the driving temperature of the reducer, the motor, the shaft of the machine base, etc.: general temperature 7, keep the mixing shaft clean and see the light, the shaft of the Liuyuan nut is close, check the rotation direction of the stirring shaft Whether the technology rotates clockwise, it is strictly prohibited to reverse.
8. Check the accessories in the kettle, such as stirring, in the regular valley, and tighten the loose bolts.
9. The reaction is light and there is no abnormal vibration or noise.
10, do a good job of equipment and maintenance. Guarantee no pollution.
Reprint this please specify: Yuming Instrument Photochemical Reaction Instrument http://