Five major considerations for completion acceptance of fittings
Acceptance of Maintenance Benefits in Order It is advisable to follow the order in the inspection and acceptance. For the completion acceptance, the emphasis is on the acceptance of the “face†project and the “lizi†addition and subtraction in the decoration. First let the decoration company's supervisor do the pre-inspection, and then the owner in accordance with the provisions of the contract project, one by one to review whether the project is completed, and then in accordance with the order of the contractual budget acceptance, so as to avoid errors and omissions. After the completion of the acceptance, the decoration company will settle the final amount of the project. In order to avoid the miscalculation of the added item, the owner also needs to measure and verify the addition and subtraction items that appear during the renovation process and take this final step. After acceptance, the owner must sign a good warranty agreement with the decoration company to safeguard their own rights and interests. Hydropower acceptance is the focus Although during the mid-term acceptance of the renovation project, the waterway has been subjected to a pressure test, the closed water test and the circuit laying have also been accepted for the concealment project. The owner, the foreman and the supervisor have signed the acceptance checklist. The pipeline part has been With basic quality assurance. However, the hydropower project also involves the installation of waterway accessories, electrical accessories, lamps, electrical products, etc., so it is still one of the focuses of the completion acceptance of the renovation project. Circuit installation acceptance is mainly through the lighting test, switch test control to see if the lighting, power is normal, the owner can also use electrician professional test pencil to test each socket to see if power, switch will open to see if there is a problem . Waterway installation acceptance is mainly to check whether the pipeline is firm, you can open the faucet to check whether it will jitter; also need to see whether the water supply pipe is smooth, there is no leakage phenomenon, mainly to see whether the joints and elbows have water droplets or appear Leakage, you can use paper towels to wipe the joints, elbow detection. In addition, it is necessary to check whether there is a phenomenon of "flooding" and "backslope" in the room with floor drain. You can turn on the faucet or shower, and after a period of time, see whether the flowing water is smooth and whether there is local water accumulation. In addition to this, it is also necessary to check whether the floor drain, the toilet and the wash basin are clean. Paint acceptance: seeing hand touch Acceptance of the paint should be followed by visual inspection and feel in natural light after the paint has dried. During the acceptance, it should be noted that the type, color, and coating of the coating should be consistent with the model. The paint surface should be smooth and clean; the varnish has clear wood grain, no wrinkling, flow and wrinkles on the large surface, basically the same color, and no brush marks; the latex paint on the wall does not have problems of peeling, brushing, bottoming, and no flow on the large surface. Falling, wrinkled skin, uniform surface color, no obvious brushing. Acceptance of wall and floor tiles: both inside and outside Check the wall tiles and floor tiles first to see whether the brick surface is square, whether the brick surface gaps are regular and uniform, whether the brick surface is broken or collapsed, and whether the position of the tile and the waist line is correct and there is no misalignment or height error. In addition to external considerations, wall tiles and floor tiles are also specially tested for their internal hollowing rate. The owner can use a metal hammer to gently tap the four corners and the middle of the wall and floor tiles to see if there is a hollow sound. The partial emptying rate of walls and floor tiles cannot exceed 5% of the total paved area, otherwise shedding problems will occur. Woodworking acceptance: flexible and easy to use For the wood door produced on site, whether the opening direction of the acceptance door should be reasonable, whether it is flexible when it is opened, and whether there is any phenomenon of block and rebound. In addition, it is also necessary to check whether the door joints are reasonable, the door joints above and below the wooden door cannot exceed 3 mm, and the bottom joints are generally 5-8 mm. In addition, it should be checked whether the joints of the door sleeves are tight. For the cabinet door, it depends on whether the switch is normal or not. When the door is opened, it should be light and no noise. In addition, check whether the cabinet door handle and various locks are installed in the correct position and whether the opening is normal. Construction acceptance entrance decoration children's room decoration paint switch decoration company decoration paint decoration budget door China Hex Bolt,stripped hex bolt supplier & manufacturer, offer low price, high quality hex bolt screw,black hex Bolts, etc. Hex Bolt,stripped hex bolt,hex bolt screw,black hex bolts Jiangsu Minglu Stainless steel Co.,ltd , https://www.minglufastener.com
 Lanbao Disi sofa lighting
Links: Decoration Tips: Notices and Construction Regulations for Balcony Decoration
Acceptance skills of fine decoration house hidden works need more careful